Personal tools
You are here: Home review Deliverables Deliverables during 3rd reporting period
Document Actions

Deliverables during 3rd reporting period

Up one level
Deliverable 1.3.2 by Gerald Matz — last modified 2009-01-04 11:22
Baseband transceiver algorithms - final version incorporating feedback from WP2 and WP3
Deliverable 2.2.1 by Christoph Mecklenbräuker — last modified 2008-12-24 00:23
VHDL Library of Reference Designs
Deliverable 2.2.1 (Report) by Christoph Mecklenbräuker — last modified 2008-12-24 09:59
Top-level Documentation of the VHDL Library of Reference Designs
Deliverable 2.3.2b by Christoph Mecklenbräuker — last modified 2008-06-30 18:27
Report on the testing of MIMO-MAC algorithms.
Deliverable 2.3.2c by Christoph Mecklenbräuker — last modified 2008-12-24 09:51
DRAFT Report on results for second ETHZ open house event
Deliverable 3.1.3 by Christoph Mecklenbräuker — last modified 2008-12-24 10:04
DRAFT Report on capacity regions of MU-MIMO systems (final report), due date: February 28, 2009.
Deliverable 3.2.1 by Christoph Mecklenbräuker — last modified 2008-03-31 21:31
Performance tradeoffs in Ad-hoc MIMO networks
Deliverable 3.2.2 by Christoph Mecklenbräuker — last modified 2008-12-24 10:06
DRAFT Signalling/routing strategies and outage properties in Ad-hoc MIMO networks, due date: February 28, 2009.
Deliverable 4.6 by Christoph Mecklenbräuker — last modified 2008-12-16 10:16
Second industry course on MU-MIMO, scheduled for February 16, 2009 in Berlin, Germany.
Deliverable 4.7 by Christoph Mecklenbräuker — last modified 2008-12-16 10:08
Second ETHZ open-house event, ETH, Zürich, Switzerland, February 13, 2009.
Deliverable 5.5 by Christoph Mecklenbräuker — last modified 2008-12-24 10:20
DRAFT Final project report

Powered by Plone, the Open Source Content Management System

This site conforms to the following standards: